Rock Face Erosion Control Black Watch Pass
Tenders are invited from experienced Contracting Companies for the above captioned project. This project involves preparing the surface of the rock face, installing, grouting and testing rock anchors and a drainage system, installing welded wire mesh and applying structural and architectural shotcrete to protect the rock face from erosion. The area to be treated is limited to a small portion of one side of the Pass.